PROPERTY | CUSTOMER | DATE | DESCRIPTION | PLACE | Img. |
2017 |
|||||
REGANOSA | REGANOSA | 2017 | Premonor Ingeniería: Reganosa Plant Engineering | (Mugardos)... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria2267276667 |
2016 |
|||||
ALTAGAZ | BIRD | 2016 | Premonor Ingeniería: Conceptual engineering of liquefied petroleum gas tank - 100.000 m3 | (Edmonton) Canada |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria041e878a49 |
2015 |
|||||
AES | FCC | 2015/16 | Premonor Ingeniería: Front end engineering of liquefied natual gas regasification unit | (Colon) Panama |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria9edea22428 |
SKANGASS | FCC | 2015 | Premonor Ingeniería: Project management of liquefied natual gas tank - 30.000 m3 | (Pori) Finland |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria1ac6ca88f8 |
2014 |
|||||
SKANGASS | FCC | 2014/16 | Mechanical Assembly of piping and steel structure in a tank of liquefied natual gas |
(Pori) Finland |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria1ac6ca88f8 |
2013 |
|||||
LNG Quintero | FCC | 2013/14 | Expansion of liquefied natual gas plant | (Quintero) Chile |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria5b8e172500 |
LNG Quintero | FCC | 2013/14 | Premonor Ingeniería: Project management of liquefied natual gas regasification expansion | (Quintero) Chile |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria5b8e172500 |
BBG | MONCOBRA | 2013 | Mechanical works in the new tank of liquefied natural gas (LNG) in Zierbena harbor | Vizcaya |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleriadbe225df0a |
2011 |
|||||
ENAGÁS | ENAGÁS | 2011 | structures and mechanical assembly in regasification plant | (Yela)... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria7f9d427685 |
ENAGÁS | ENAGÁS | 2011 | Prefabrication and Assembly of new compressor station | (Chinchilla)... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria91abc30053 |
2010 | |||||
ENAGÁS | ENAGÁS | 2010/11 | Assembly of piping and equipment in new regasification plant | (Gijón) Asturias |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleriafc3687579a |
ENAGÁS | ENAGÁS | 2010 | Interconnection of tank No. 5 in regasification plant | (Cartagena)... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria5b02705654 |
2009 | |||||
ENAGAS | ENAGAS | 2009/10 | Interconnection of tank No. 5 in regasification plant | Huelva... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria1bf9341f6f |
ENAGÁS | ACCIONA | 2009/10 | Installation of pipe in the tank No. 5 in regasification plant | Huelva... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria98c6b12df4 |
ENAGAS | SOLAR TURBINES | 2009 | Assembly of compressed air system and interconnections of compressor tube in compressor station | Jaca Y Montesa |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria7defb841fd |
2008 |
|||||
ENAGAS | SOLAR TURBINES | 2008 | Assembly of compressed air system and interconnections of compressor tube in compressor station | (Haro) La Rioja |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria39fc266312 |
ENAGAS | ENAGAS | 2008/09 | Prefabrication and assembly of new compressor station | (Montesa)... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria9a4f80089f |
ENAGAS | ENAGAS | 2008/09 | Prefabrication and assembly of new compressor station | (Lumbier)... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleriac46f4b3644 |
2007 | |||||
ENAGÁS | SOLAR TURBINES | 2007 | Assembly of compressed air system and interconnections of compressor tube in compressor station | Zaragoza |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria19306fcd94 |
2006 | |||||
REGANOSA | MONCOBRA | 2006 | Assembly of stainless steel pipe in new regasification plant | (Mugardos)... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleriac1698b594d |
2005 | |||||
REGANOSA | MONCOBRA | 2005/06 | Stainless pipe prefabrication in new regasification plant | (Mugardos)... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleriaea6be3748c |
ENAGÁS | SOLAR TURBINES | 2005 | Assembly of compressed air system in compressor station | Sevilla... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria324bb594b0 |
ENAGÁS | SOLAR TURBINES | 2005 | Assembly of compressed air system and interconnections of compressor tube in Tivissa compressor station | Tarragona |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria6d89347da0 |
2004 | |||||
ENAGÁS | ENAGÁS | 2004/05 | Expansion of compressor station | (Almendralejo)... |
View the embedded image gallery online at:
http://premonor.com/index.php/en/references/gas#sigProGalleria88f97cc60e |