Gas

PROPERTY CUSTOMER DATE DESCRIPTION PLACE Img.
2021
VOPAK SENER 2021 Line replacement work during the 2021 shutdown at Terminal Gate (Rotterdam)...
2017
REGANOSA REGANOSA 2017 Premonor Ingeniería: Reganosa Plant Engineering (Mugardos)...
2016
ALTAGAZ BIRD 2016 Premonor Ingeniería: Conceptual engineering of liquefied petroleum gas tank - 100.000 m3 (Edmonton) Canada
2015
AES FCC 2015/16 Premonor Ingeniería Front end engineering of liquefied natual gas regasification unit (Colon) Panama
SKANGASS FCC 2015 Premonor Ingeniería Project management of liquefied natual gas tank - 30.000 m3 (Pori) Finland
2014
SKANGASS FCC 2014/16 Mechanical Assembly of piping and steel structure in a tank of liquefied natual gas          
(MULTIMEDIA FABRICATION)       (MULTIMEDIA ASSEMBLY)
(Pori) Finland
2013
LNG Quintero FCC 2013/14 Expansion of liquefied natual gas plant (Quintero) Chile
LNG Quintero FCC 2013/14 Premonor Ingeniería Project management of liquefied natual gas regasification expansion (Quintero) Chile
BBG MONCOBRA 2013 Mechanical works in the new tank of liquefied natural gas (LNG) in Zierbena harbor Vizcaya
2011
ENAGÁS ENAGÁS 2011 structures and mechanical assembly in regasification plant (Yela)...
ENAGÁS ENAGÁS 2011 Prefabrication and Assembly of new compressor station (Chinchilla)...
2010
ENAGÁS ENAGÁS 2010/11 Assembly of piping and equipment in new regasification plant (Gijón) Asturias
ENAGÁS ENAGÁS 2010 Interconnection of tank No. 5 in regasification plant (Cartagena)...
2009
ENAGAS ENAGAS 2009/10 Interconnection of tank No. 5 in regasification plant Huelva...
ENAGÁS ACCIONA 2009/10 Installation of pipe in the tank No. 5 in regasification plant Huelva...
ENAGAS SOLAR TURBINES 2009 Assembly of compressed air system and interconnections of compressor tube in compressor station Jaca Y Montesa
2008
ENAGAS SOLAR TURBINES 2008 Assembly of compressed air system and interconnections of compressor tube in compressor station (Haro) La Rioja
ENAGAS ENAGAS 2008/09 Prefabrication and assembly of new compressor station (Montesa)...
ENAGAS ENAGAS 2008/09 Prefabrication and assembly of new compressor station (Lumbier)...
2007
ENAGÁS SOLAR TURBINES 2007 Assembly of compressed air system and interconnections of compressor tube in compressor station Zaragoza
2006
REGANOSA MONCOBRA 2006 Assembly of stainless steel pipe in new regasification plant (Mugardos)...
2005
REGANOSA MONCOBRA 2005/06 Stainless pipe prefabrication in new regasification plant (Mugardos)...
ENAGÁS SOLAR TURBINES 2005 Assembly of compressed air system in compressor station Sevilla...
ENAGÁS SOLAR TURBINES 2005 Assembly of compressed air system and interconnections of compressor tube in Tivissa compressor station Tarragona
2004
ENAGÁS ENAGÁS 2004/05 Expansion of compressor station (Almendralejo)...

Central and Workshops

C./ Parroquia de Guísamo Parcela A-1, Nave 1,
Polígono de Bergondo, 15165 Bergondo - A Coruña
Tlf.: 981 65 03 37 / fax: 981 65 08 29
info@premonor.com

Commercial contact

palvarez@premonor.com
European Union
You are here: Inicio References Gas