| PROPERTY | CUSTOMER | DATE | DESCRIPTION | PLACE | Img. | 
| 2022 | |||||
| REAL MADRID | PHB WESERHUTTE | 2021/22 | Mechanical assembly of the retractable latticework and west stand... | Madrid | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria2cd6f90d00 | 
| EIFFACE | PHB | 2021/22 | Complete mechanical erection of PHB bulk solids terminal EIFFAGE... | Alicante | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria9d56230cfd | 
| 2021 | |||||
| FINSA | FINSA | 2021 | Supply, manufacture and assembly of boiler to dryer gas ducts. | (Santiago... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria9a4364f09b | 
| ERSHIP | TAM | 2021/22 | Mechanical assembly of the structures, equipment and belts for... | Cartagena | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria10236776b9 | 
| FINSA | FINSA | 2021 | Supply, manufacture and erection of cogeneration gas ductwork | (Santiago... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriac6920cf218 | 
| 2020 | |||||
| FINSA | FINSA | 2020 | Manufacture and supply of dust measuring pipes and bends | (Santiago... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriabee389e9b7 | 
| FINSA | FINSA | 2020 | Supply, manufacture and assembly of the boiler gas ducts to the dryer | (Santiago... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria1834054e36 | 
| FIBRE EXCELLENCE | VEOLIA SERV. NORTE | 2020 | Mechanical assembly of piping and equipment for the new plant... | Saint Gaudens | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaff7a20622e | 
| TERSA | UTE SCR BESOS | 2020 | Piping assembly for the construction of a catalytic system in... | Barcelona | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria811a706e8d | 
| TERSA | UTE SCR BESOS | 2020 | Assembly of equipment and structure for the construction of .... | Barcelona | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria9daeea9d9c | 
| 2019 | |||||
| ALCOA | ALCOA | 2019 | Boiler repair work at the ALCOA plant | San Ciprián | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria16497fa629 | 
| FINSA | FINSA | 2019 | Supply and assembly of pipe rack for the interconnection of Vyncke... | Santiago | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriad3ee28641d | 
| DIMASA | DIM WATER | 2019 | Works by administration in Dimwater Engineering central workshops... | Terrassa | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria10a501eb97 | 
| ENCE | ENCE | 2019 | Supply and mechanical assembly of TIE-Ins ENCE Plant Shutdown | Pontevedra | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaa8043f98ee | 
| FACET | FACET | 2019 | Works by administration in central workshops of FACET Ibérica | Arteixo | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria698458cc25 | 
| ENCE | ENCE | 2019 | Supply and mechanical assembly of new Vacuum Filters - ENCE | Pontevedra | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaf90c72c197 | 
| FERROATLÁNTICA | FERROATLÁNTICA | 2019 | Mechanical maintenance works Ferroatlántica Plant - Cee | Dumbría | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria670a0a04da | 
| FINSA | FINSA | 2019 | Supply and mechanical assembly of new pipe lines Finsa Plant | Santiago | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria710d43a788 | 
| 2018 | |||||
| CIE GALFOR | CIE GALFOR | 2018 | Mechanical maintenance work at CIE GALFOR plant | (San Cibrao...) | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria58e670380c | 
| ECEBOL | SACYR | 2018/19 | Mechanical and structural assembly of New Cement Production Line... | (Potosí...) | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria36419457ca | 
| UTE PG | UTE PG | 2018 | Works by administration in Parc Glories Building | Barcelona | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria6b2587c86d | 
| ENCE | ENCE | 2018 | General Shutdown 2018 - Hydraulic tests in Digesters - ENCE | Pontevedra | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria2b377f497f | 
| AIR LIQUIDE | AIR LIQUIDE | 2018 | Mechanical Assembly ELA4 Cryogenic Fluids System - European... | Guayana Fr. | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria4c7b46acd2 | 
| ENCE | ENCE | 2018 | 2018 General Shutdown - Metallurgical works in CR-3 - ENCE Plant | Pontevedra | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriac5d1b96e10 | 
| ENCE | ENCE | 2018 | General Shutdown 2018 - TIE-Ins on Sunds Press Pipes - ENCE | Pontevedra | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria08c72d2e08 | 
| ENCE | ENCE | 2018 | Supply, manufacture and assembly of 59 TIE-INs ENCE Plant | Pontevedra | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriabad78ef2a7 | 
| ENCE | ENCE | 2018 | Mechanical assembly Vacuum Pump Room - ENCE Plant | Pontevedra | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriafcedaefbc5 | 
| 2016 | |||||
| CAMPOFRÍO | SAN JOSÉ | 2016 | Mechanical erection of Meat Processing Plant Campofrío Burgos | Burgos | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriafcfaaaac67 | 
| FINSA | FINSA | 2016 | Annual maintenance shutdown of FINSA Plant in Ourense | (San Cibrao...) | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria9b1b6c405f | 
| FERROATLÁNTICA | FERROATLÁNTICA | 2016 | Annual maintenance shutdown of Ferroatlática Plants in Cee & Dumbría... | Cee | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriafcfaaaac67 | 
| CIE GALFOR | CIE GALFOR | 2016 | Annual maintenance shutdown of CIE GALFOR Plant | (San Cibrao...) | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria3d317502de | 
| BIMBO | SAN JOSÉ | 2016 | Mechanical erection of BIMBO Bread Processing Plant | (Azuqueca...) | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria3a8e817fa6 | 
| SOGAMA | THENOMAQ GALICIA | 2016 | Annual maintenance shutdown Recycling Plant Sogama 2016 | Cerceda | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriafcfaaaac67 | 
| ENCE | ENCE | 2016 | Mechanical erection and interconnection of new Cooler and Heater... | Pontevedra | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriafcfaaaac67 | 
| VOLKSWAGEN | SAN JOSÉ | 2016 | Mechanical erection facilities expansion in Volkswagen Plant Navarra... | Pamplona | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriafcfaaaac67 | 
| SMURFFIT KAPPA | HPD VEOLIA | 2016 | Mechanical assembly of new washing lines in Smurffit Kappa Plant... | Durango | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriafcfaaaac67 | 
| 2015 | |||||
| OHL INDUSTRIAL | 2015 | New thermosolar experimental plant in Technological Science... | Getafe | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria3d317502de | |
| SEAT | SAN JOSÉ | 2015 | Mechanical erection Meisterbock facilities expansion in Seat Plant | Martorell | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria901297bd25 | 
| ICL | VEOLIA | 2015/16 | Mechanical erection of piping and supports in ICL Iberpotash Plant | (Suria)Barcelona | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriafcfaaaac67 | 
| CAMERON | CAMERON | 2015/16 | Manufacturing of drilling muds modules | (Bergondo)... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaf9a4bd7c46 | 
| FINSA | FINSA | 2015 | Annual maintenance shutdown of FINSA Plant in Ourense | (San Cibrao...) | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria9b1b6c405f | 
| CIE GALFOR S.A. | CIE GALFOR S.A. | 2015 | Maintenance of CIE GALFOR plant. | (San Cibrao...) | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria3d317502de | 
| MASOL IBERIA | MASOL IBERIA | 2015 | Mechanical works in biofuels plant | (Ferrol)A Coruña | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria901297bd25 | 
| BIMBO | SAN JOSÉ | 2015 | New facilities of BIMBO plant equipment | (Azuqueca...) | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria3a8e817fa6 | 
| 2014 | |||||
| IBERPOTASH | SERIDOM | 2014/15 | Expansion of potash processing plant | (Suria)Barcelona | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriacea39cfd9f | 
| FINSA | FINSA | 2014 | Annual maintenance shutdown of FINSA Plant in Rábade | (Rábade)Lugo | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria77ce253804 | 
| FINSA | FINSA | 2014 | Annual maintenance shutdown of FINSA Plant in Ourense | (San Cibrao...) | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria6b7c26f699 | 
| CIE GALFOR S.A. | CIE GALFOR S.A. | 2014 | Maintenance of CIE GALFOR plant. | (San Cibrao...) | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria8211e4cdf9 | 
| EMESA | 2014 | Assembly of the new Jaca bridge | (Jaca) Huesca | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaef54115457 | |
| 2013 | |||||
| ACEITES ABRIL | ACEITES ABRIL | 2013 | Compressed air system in new oil refining plant | San Cibrao... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria9cb895b132 | 
| FINSA | FINSA | 2013 | Annual maintenance shutdown of FINSA Plants in Rábade, Santiago and Ourense | Varios | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria4857c598ff | 
| MEGASA | MEGASA | 2013 | Maintenance shutdown in MEGASA plant | (Narón)... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria9017cc8883 | 
| ENCE | ABANTIA | 2013 | Maintenance shutdown of ENCE plant | (Navia)... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria33c0564fd5 | 
| 2012 | |||||
| ALSTOM POWER S.A. | ALSTOM POWER S.A. | 2012 | Mechanical assembly in TERSA plant | Barcelona | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriacbc4681129 | 
| 2010 | |||||
| INFINITA RENOVABLES | INFINITA RENOVABLES | 2010 | Modifications to the Biodiesel plant | Ferrol | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriac80ef4eacc | 
| 2009 | |||||
| INFINITA RENOVABLES | ISOLUX-CORSAN | 2009 | Clarifying piping Assembly in biodiesel plant | Castellón | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria90111d0f7c | 
| 2008 | |||||
| INFINITA RENOVABLES | ISOLUX-CORSAN | 2008/09 | Prefabrication and installation of biodiesel plant | Ferrol | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaaa1f666c21 | 
| 2007 | |||||
| BIODIESEL BILBAO | BIODIESEL BILBAO | 2007/08/09 | New Biodiesel plant | Bilbao | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria08734fc9d3 | 
| MOYRESA | MOYRESA | 2007 | Oil refinery in Cartagena plant | Murcia | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaa5ce57c823 | 
| 2006 | |||||
| MOYRESA | MOYRESA | 2006 | Assembly of pipeline of GRP and stainless in plant for sea water in the port of Cartagena | Murcia | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaeb3524e81c | 
| MOYRESA | MOYRESA | 2006 | Assembly of pipeline of GRP and stainless in plant for sea water in the port of Zierbana | Bilbao | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriabf8fbd2cbf | 
| 2005 | |||||
| ERTISA | UTE FENOL CUMENO | 2005/06 | Prefabrication and assembly of pipe in new phenol plant | Huelva... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria63e32616ed | 
| MOYRESA | MOYRESA | 2005 | Assembly of pipeline of 6' in new plant of Moyresa in the port of Zierbena | Bilbao | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaa2806a64dd | 
| MOYRESA | MOYRESA | 2005 | Assembly of stainless steel duct in new plant of Moyresa in the port of Zierbena | Bilbao | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaba76499568 | 
| 2004 | |||||
| MOYRESA | MOYRESA | 2004 | Assembly lines stainless steel in plant of La Coruña | La Coruña | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria04f538a2d3 | 
| 2002 | |||||
| INABENSA | 2002 | Construction of the new bioethanol plant | (Teixeiro)... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria5fedc2b476 | |
| ZELTIA | ATIL COBRA | 2002 | Mechanical Assembly of piping and equipment in new pharmaceutical products plant | (Porriño)... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria40c308c9c6 | 
| ALCOA | ALCOA | 2002 | Installation of water pipe systems | La Coruña | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria89e9dfa458 | 
| ALCOA | ALCOA | 2002 | Installation of pipe for refrigerants | La Coruña | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria71595ddfe7 | 
| 2001 | |||||
| ALCOA | ALCOA | 2001 | Prefabrication and Assembly of collector in room counters | La Coruña | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaa29167c91d | 
| ALCOA | ALCOA | 2001 | Cooling tunnel door mounting | La Coruña | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriacf267548e9 | 
| ABENER (PREMONOR- TMI) | INABENSA | 2001/02 | Mechanical Assembly of bioethanol plant | (Curtis)... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleriaab531034a9 | 
| ZELTIA | JACOBS-SERELAND | 2001/02 | Disassembly and Assembly of platform and tanks | (Porriño)... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria4d28af0c29 | 
| 2000 | |||||
| CONSERVAS CALVO | CONSERVAS CALVO | 2000 | Supply and Assembly of stainless pipe compressed air ring | (Esteiro)... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria452267a69e | 
| CONSERVAS CALVO | CONSERVAS CALVO | 2000 | Supply and installation of filters in power plant pumps | (Esteiro)... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria2cf39f19c0 | 
| CONSERVAS CALVO | CONSERVAS CALVO | 2000 | Several works in autoclaves | (Esteiro)... | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria61ed0499ea | 
| LECHE LEYMA | LECHE LEIMA | 2000 | Several works ofmaintenance on Sabon | La Coruña | 
	View the embedded image gallery online at:
	 https://www.premonor.com/index.php/en/references/general-industry#sigProGalleria56302fbab0 | 
 
						 
						 
						 
														

 
     
 